Our company currently builds state of the art fracturing trailers and other fracturing equipments. We provide the fracturing pump trailer, truck and skid mounted fracturing units according to your specific needs. Besides, we offer several different pump configurations such as triplex or quintuplex types.


  • Features
  • 1. The fracturing trailer is configured with triplex or quintuple pump, advanced digital controlling system and optional analog controller.

    2. We offer cold weather packaging exclusive for arctic conditions. Besides, desert package is also supplied by us to meet the extreme-temperature environment and deep sand.

    3. On-board boost pump is optional for clients.

    4. It is compatible with PC frac controls.

    5. Our fracturing trailers have owned CE certificate.

    6. Its maintenance is user-friendly. 

  • Hydraulic Fracturing Process
  • It starts with a good bit of water and a lot of sand. Mix the water and sand together, then, apply thousand pounds of pressure and introduce them into a reservoir several thousand feet underground. Generally, a small percentage of additives are added to aid in delivering that solution down the hatch. Then, the force of water creates a network of tiny fissures in the impermeable rock. The flow water acts as a delivery mechanism for the sand, which finds its way into those newly created cracks and holds them open. This creates passageways through which the previously trapped natural can get to the wellbore. Finally, the fracturing process is finished; on average, it takes 3 to 10 days to complete. Now it's time for the operator to remove the water, clearing the way for the newly stimulated well to produce energy for the next 20, 30, 40, even 50 years. 

    Related Product
    • YLC105-1340
    • YLC105-1340
      YLC105-1340 fracturing truck is equipment with 3ZB105-1340 triplex fracturing pumps. It is suitable for shallow, medium and deep well fracturing operations in oil and gas fields. Maximum pressure of its fracturing pump can reach up to 105 MPa. This truck is mainly composed of chassis, deck engine, hydraulic transmission, triplex...
    • YLC105-1490
    • YLC105-1490
      YLC105-1490 fracturing truck (2000) belongs to truck mounted fracturing unit used in oil and gas field. It is applicable for various fracturing work in large/medium/small-depth wells. With 3ZB-1490 triplex plunger pumps, the maximum pressure generated is up to 105 MPa. Main components of this fracturing unit are chassis, deck en...